Close

1. Identity statement
Reference TypeConference Paper (Conference Proceedings)
Siteplutao.sid.inpe.br
Holder Codeisadg {BR SPINPE} ibi 8JMKD3MGPCW/3DT298S
Identifier8JMKD3MGP3W/3KN33U9
Repositorysid.inpe.br/plutao/2015/12.04.13.50.49
Last Update2015:12.11.12.20.28 (UTC) administrator
Metadata Repositorysid.inpe.br/plutao/2015/12.04.13.50.50
Metadata Last Update2022:04.09.17.55.42 (UTC) administrator
DOI10.3233/978-1-61499-544-9-71
Labellattes: 1555060330133009 3 GarbiLourChag:2015:KiMoPr
Citation KeyGarbiLourChag:2015:KiMoPr
TitleKinematic model of project scheduling with resource constrained under uncertainties
FormatPapel
Year2015
Access Date2024, May 14
Secondary TypePRE CI
Number of Files1
Size471 KiB
2. Context
Author1 Garbi, Giuliani Paulineli
2 Loureiro, Geilson
3 Chagas Junior, Milton de Freitas
Resume Identifier1
2 8JMKD3MGP5W/3C9JH57
Group1 DIR-DIR-INPE-MCTI-GOV-BR
2 LIT-LIT-INPE-MCTI-GOV-BR
3 DIR-DIR-INPE-MCTI-GOV-BR
Affiliation1 Instituto Nacional de Pesquisas Espaciais (INPE)
2 Instituto Nacional de Pesquisas Espaciais (INPE)
3 Instituto Nacional de Pesquisas Espaciais (INPE)
Author e-Mail Address1 giuliani.garbi@inpe.br
2 geilson.loureiro@inpe.br
3 milton.chagas@inpe.br
Conference NameISPE International Conference on Concurrent Engineering, 22
Conference LocationDelft
Book TitleProceedings
Tertiary TypePaper
History (UTC)2015-12-04 13:50:50 :: lattes -> administrator ::
2022-04-09 17:55:42 :: administrator -> simone :: 2015
3. Content and structure
Is the master or a copy?is the master
Content Stagecompleted
Transferable1
Content TypeExternal Contribution
KeywordsGestão de Projetos
Gestão de risco
Toamda de decisão
Pesquisa e Desenvolvimento
AbstractProjects represent the principal means of materialization of products. The inherent complexity of product projects is treated through the techniques and approaches project management. Throughout products life cycle the techniques and approaches project management are mainly involved in the planning, programming and control of project activities conducted in context of resource constrained under uncertainties. In addition of scenarios the complexity of the projects, there are some classes of products, typical of industries of the defense, aerospace, telecommunication, software, and biomedicine, which are problematic for current methods of resource constrained project planning and scheduling under uncertainty. The existing methods fail because they suffer from one or more of the following limitations: focused mainly on the basic RCPSP (Resource Constrained Project Scheduling Problem) model; dealing with only one source of uncertainty, mostly in duration of activities; and do not model uncertainties. This paper presents the kinematic model of projects scheduling which considering the inherent restrictions in nature of the projects: precedence among project activities; uncertainties of the duration of project activities; and uncertainties in availability of resources for execution of project activities. The kinematic model of projects scheduling provides a graph and mathematical model with the advantages: estimation of the project duration and resources due to uncertainties; estimation of the uncertainties due to project duration and resources; improvement of the outcomes of planning and scheduling of project activities; and assists the dynamics of projects providing information for collaboration policy of the durations and resources between project activities and between different projects. This article describes the Resource Constrained Project Scheduling Problem under uncertainties, discuss previous work on planning under uncertainty, and presentation of the kinematic model of projects scheduling with resource constrained under uncertainties along with a small example of implementation.
AreaETES
Arrangement 1urlib.net > BDMCI > Fonds > Produção anterior à 2021 > COLIT > Kinematic model of...
Arrangement 2urlib.net > BDMCI > Fonds > Produção anterior à 2021 > DIR > Kinematic model of...
doc Directory Contentaccess
source Directory Contentthere are no files
agreement Directory Contentthere are no files
4. Conditions of access and use
data URLhttp://urlib.net/ibi/8JMKD3MGP3W/3KN33U9
zipped data URLhttp://urlib.net/zip/8JMKD3MGP3W/3KN33U9
Languageen
Target File1_garbi2.pdf
User Grouplattes
simone
Reader Groupadministrator
simone
Visibilityshown
Read Permissionallow from all
Update Permissionnot transferred
5. Allied materials
Mirror Repositoryurlib.net/www/2011/03.29.20.55
Next Higher Units8JMKD3MGPCW/444BQ9E
8JMKD3MGPCW/449PGL8
Citing Item Listsid.inpe.br/bibdigital/2021/03.05.04.22 1
URL (untrusted data)http://ebooks.iospress.nl/volume/transdisciplinary-lifecycle-analysis-of-systems-proceedings-of-the-22nd-ispe-inc-international-conference-on-concurrent-engineering-july-20-23-2015
Host Collectiondpi.inpe.br/plutao@80/2008/08.19.15.01
6. Notes
NotesSetores de Atividade: Pesquisa e desenvolvimento científico.
Empty Fieldsarchivingpolicy archivist callnumber copyholder copyright creatorhistory date descriptionlevel dissemination e-mailaddress edition editor isbn issn lineage mark nextedition numberofvolumes orcid organization pages parameterlist parentrepositories previousedition previouslowerunit progress project publisher publisheraddress rightsholder schedulinginformation secondarydate secondarykey secondarymark serieseditor session shorttitle sponsor subject tertiarymark type versiontype volume
7. Description control
e-Mail (login)simone
update 


Close