1. Identity statement | |
Reference Type | Conference Paper (Conference Proceedings) |
Site | plutao.sid.inpe.br |
Holder Code | isadg {BR SPINPE} ibi 8JMKD3MGPCW/3DT298S |
Identifier | 8JMKD3MGP3W/3KN33U9 |
Repository | sid.inpe.br/plutao/2015/12.04.13.50.49 |
Last Update | 2015:12.11.12.20.28 (UTC) administrator |
Metadata Repository | sid.inpe.br/plutao/2015/12.04.13.50.50 |
Metadata Last Update | 2022:04.09.17.55.42 (UTC) administrator |
DOI | 10.3233/978-1-61499-544-9-71 |
Label | lattes: 1555060330133009 3 GarbiLourChag:2015:KiMoPr |
Citation Key | GarbiLourChag:2015:KiMoPr |
Title | Kinematic model of project scheduling with resource constrained under uncertainties |
Format | Papel |
Year | 2015 |
Access Date | 2024, May 14 |
Secondary Type | PRE CI |
Number of Files | 1 |
Size | 471 KiB |
|
2. Context | |
Author | 1 Garbi, Giuliani Paulineli 2 Loureiro, Geilson 3 Chagas Junior, Milton de Freitas |
Resume Identifier | 1 2 8JMKD3MGP5W/3C9JH57 |
Group | 1 DIR-DIR-INPE-MCTI-GOV-BR 2 LIT-LIT-INPE-MCTI-GOV-BR 3 DIR-DIR-INPE-MCTI-GOV-BR |
Affiliation | 1 Instituto Nacional de Pesquisas Espaciais (INPE) 2 Instituto Nacional de Pesquisas Espaciais (INPE) 3 Instituto Nacional de Pesquisas Espaciais (INPE) |
Author e-Mail Address | 1 giuliani.garbi@inpe.br 2 geilson.loureiro@inpe.br 3 milton.chagas@inpe.br |
Conference Name | ISPE International Conference on Concurrent Engineering, 22 |
Conference Location | Delft |
Book Title | Proceedings |
Tertiary Type | Paper |
History (UTC) | 2015-12-04 13:50:50 :: lattes -> administrator :: 2022-04-09 17:55:42 :: administrator -> simone :: 2015 |
|
3. Content and structure | |
Is the master or a copy? | is the master |
Content Stage | completed |
Transferable | 1 |
Content Type | External Contribution |
Keywords | Gestão de Projetos Gestão de risco Toamda de decisão Pesquisa e Desenvolvimento |
Abstract | Projects represent the principal means of materialization of products. The inherent complexity of product projects is treated through the techniques and approaches project management. Throughout products life cycle the techniques and approaches project management are mainly involved in the planning, programming and control of project activities conducted in context of resource constrained under uncertainties. In addition of scenarios the complexity of the projects, there are some classes of products, typical of industries of the defense, aerospace, telecommunication, software, and biomedicine, which are problematic for current methods of resource constrained project planning and scheduling under uncertainty. The existing methods fail because they suffer from one or more of the following limitations: focused mainly on the basic RCPSP (Resource Constrained Project Scheduling Problem) model; dealing with only one source of uncertainty, mostly in duration of activities; and do not model uncertainties. This paper presents the kinematic model of projects scheduling which considering the inherent restrictions in nature of the projects: precedence among project activities; uncertainties of the duration of project activities; and uncertainties in availability of resources for execution of project activities. The kinematic model of projects scheduling provides a graph and mathematical model with the advantages: estimation of the project duration and resources due to uncertainties; estimation of the uncertainties due to project duration and resources; improvement of the outcomes of planning and scheduling of project activities; and assists the dynamics of projects providing information for collaboration policy of the durations and resources between project activities and between different projects. This article describes the Resource Constrained Project Scheduling Problem under uncertainties, discuss previous work on planning under uncertainty, and presentation of the kinematic model of projects scheduling with resource constrained under uncertainties along with a small example of implementation. |
Area | ETES |
Arrangement 1 | urlib.net > BDMCI > Fonds > Produção anterior à 2021 > COLIT > Kinematic model of... |
Arrangement 2 | urlib.net > BDMCI > Fonds > Produção anterior à 2021 > DIR > Kinematic model of... |
doc Directory Content | access |
source Directory Content | there are no files |
agreement Directory Content | there are no files |
|
4. Conditions of access and use | |
data URL | http://urlib.net/ibi/8JMKD3MGP3W/3KN33U9 |
zipped data URL | http://urlib.net/zip/8JMKD3MGP3W/3KN33U9 |
Language | en |
Target File | 1_garbi2.pdf |
User Group | lattes simone |
Reader Group | administrator simone |
Visibility | shown |
Read Permission | allow from all |
Update Permission | not transferred |
|
5. Allied materials | |
Mirror Repository | urlib.net/www/2011/03.29.20.55 |
Next Higher Units | 8JMKD3MGPCW/444BQ9E 8JMKD3MGPCW/449PGL8 |
Citing Item List | sid.inpe.br/bibdigital/2021/03.05.04.22 1 |
URL (untrusted data) | http://ebooks.iospress.nl/volume/transdisciplinary-lifecycle-analysis-of-systems-proceedings-of-the-22nd-ispe-inc-international-conference-on-concurrent-engineering-july-20-23-2015 |
Host Collection | dpi.inpe.br/plutao@80/2008/08.19.15.01 |
|
6. Notes | |
Notes | Setores de Atividade: Pesquisa e desenvolvimento científico. |
Empty Fields | archivingpolicy archivist callnumber copyholder copyright creatorhistory date descriptionlevel dissemination e-mailaddress edition editor isbn issn lineage mark nextedition numberofvolumes orcid organization pages parameterlist parentrepositories previousedition previouslowerunit progress project publisher publisheraddress rightsholder schedulinginformation secondarydate secondarykey secondarymark serieseditor session shorttitle sponsor subject tertiarymark type versiontype volume |
|
7. Description control | |
e-Mail (login) | simone |
update | |
|